[Anchor]
As you just heard, nine South Koreans at a hydroelectric power plant construction site have lost contact due to floods in Nepal. This large-scale project involving a domestic public corporation and a construction company was scheduled for completion by the end of this year, and both companies have decided to urgently dispatch response teams to the site.
Reporter Sim Useop.
[Reporter]
The place where South Korean workers lost contact due to the massive floods in Nepal is the Upper Trishuli-1 hydroelectric power plant construction site.
Upper Trishuli-1 is a 216-megawatt hydroelectric power plant under construction along the Trishuli River in the Rasuwa region, located 70 kilometers north of Nepal's capital, Kathmandu.
The total project cost is 647 million dollars, with a construction period of 5 years, and it is scheduled for completion at the end of this year.
This is the first private-sector hydropower project in Nepal involving South Korean companies, with Korea South-East Power (KOEN) participating in project development and operation, and Doosan Enerbility handling plant design, construction, and the supply of major equipment such as turbines and generators.
Doosan Enerbility stated that there are a total of 20 South Korean employees at the site, among whom 6 are currently out of contact.
KOEN also stated that out of the 7 employees dispatched to Nepal, 3 male employees who were at the power plant site are out of contact.
The remaining 4 employees are reportedly safe.
The two companies explained that local communication conditions are poor and are continuously checking the exact locations and status of the employees who lost contact.
Doosan Enerbility stated, "We immediately formed an emergency response headquarters for rapid situation assessment and accident handling, and plan to urgently dispatch an on-site response team including CEO Jeong Yeon-in to the site."
It also added, "We will do our utmost to support the search and rescue of the missing persons by cooperating closely with relevant authorities and project stakeholders."
KOEN also plans to send personnel to the site today (August 27) to set up a camp and support rescue operations.
(Video Editing: Choi Hye-ran, Source Material: Doosan Enerbility and Korea South-East Power YouTube)
※ Please note: This article was translated by AI and may contain errors.
Sudden Disaster Right Before Completion This Year... KOEN and Doosan Dispatch Emergency Teams
Copyright Ⓒ SBS. All rights reserved. 무단 전재, 재배포 및 AI학습 이용 금지
Trending Now
-
11-Year-Old Boy Dies at Church While Biological Mother Who Did Not Raise Him Collected Half of Government Allowances
-
Video News
Say "Kimchi" to Dying Friend... Shock Over "Unprecedented" Unanswered Questions Episode
-
Father Who Assaulted 40-Year-Old Son With 23cm Tool Given Suspended Sentence
-
Jun Hyun-moo Denies Sponsorship Allegations Over Kazakhstan Trip, Embassy Confirms Rental Car Document Shortfalls
-
Video News
"Process It Quickly" Flood of Complaints... The Absurd Truth That Left Seoul City Baffled
Video News
Video News